Prestige Parklane 220 KV Power Substation

Prestige Parklane 220 KV Power Substation | Enterprise Estate


Prestige Parklane 220 KV power substation is a dedicated substation planned within the 20.35-acre enterprise estate, on the western side of the central boulevard. The estate, the Upcoming Prestige Technology & Logistics Hub, is a future phase. Only the residential Phase 1 is RERA-registered and under way. A substation at this voltage is transmission-grade infrastructure. It is planned to support three data centres along with warehouse and manufacturing blocks.

What Is a 220 KV Substation?


A 220 KV substation takes transmission-level power and converts it for distribution across a large site. Electricity travels long distances at high voltage and is stepped down in stages before it reaches a building. A 220 KV substation sits high in that chain.

Ordinary residential layouts do not need one. They draw from the local distribution network at far lower voltages. A dedicated substation is built when a site expects heavy, constant and uninterrupted demand.

Why Prestige Parklane Needs a 220 KV Substation


Prestige Parklane plans a 220 KV substation because of its three planned data centres. Each is planned with a basement, a ground floor & six upper floors, rising to 46.20 m. Data centres are among the most power-hungry buildings in modern real estate.

A data centre draws close to its full load around the clock, every day of the year. It cannot tolerate interruption. The planned warehouse and manufacturing blocks add their own steady demand on top.

Element of the estate Detail
Enterprise estate 20.35 acres of the 32.26-acre master plan, an upcoming future phase
Data centres Three blocks, basement + ground + six floors, 46.20 m
Warehouse block Ground floor with mezzanine
Manufacturing block Ground floor with mezzanine
Power infrastructure Dedicated 220 KV substation (planned)

Prestige Parklane Enterprise Estate Occupiers


The Prestige Parklane enterprise estate is planned as a future phase for large industrial occupiers, not small commercial units. A 220 KV connection needs utility coordination, land and long lead times, so it is not built speculatively.

For a homebuyer, this has two sides. It supports the employment case behind the address. It also means the future neighbours across the boulevard will be industrial buildings, not shops and offices.

Substation Noise and Power Backup for Residents


Substation noise is low by industrial standards. Transformers produce a low hum, without the noise of machinery or shift traffic. A substation has a compact footprint and runs with very few staff on site.

The residential side has its own power arrangements. The specification provides a generator for all common areas. A generator charge of ₹85 per sq ft plus GST is a fixed possession charge on every apartment, listed on the fact sheet.

Substation Questions to Ask Before Booking


Ask the sales team these questions about the Prestige Parklane substation:

  • Where exactly does the substation sit on the sanctioned plan, and how far is it from the nearest tower?
  • What separation, screening or landscaping is planned between the estate and the residential precinct?
  • Which approvals are in place for the substation, and what is its delivery schedule?
  • How will the residential precinct's own power supply and backup be arranged at handover?

Ask for the building plan approved by KIADB on 13 August 2026, reference DO3-KIADB-00128/26-27/BP. It shows where each element actually sits, unlike a brochure.

Prestige Parklane Power and Water Connection Charges


Prestige Parklane power and water connection charges are paid at possession. Buyers pay ₹75 per sq ft each for BESCOM and BWSSB, plus ₹85 per sq ft for the generator, all with GST. The RERA filing records borewells as the source of water for the residential phase.

Plan for these charges early. They all fall due together at handover on 6 January 2031, not during the build.

FAQs


1. Does Prestige Parklane have its own substation?

The master plan includes a dedicated 220 KV substation planned within the 20.35-acre enterprise estate, west of the central boulevard. It is part of an upcoming future phase.

2. Why does the project need a 220 KV substation?

Because the estate is planned to hold three data centres plus warehouse and manufacturing blocks, and those draw heavy, continuous power.

3. Is a substation noisy for nearby homes?

Transformers produce a low hum rather than machinery noise, and substations run with very few staff and little traffic.

4. Where can I see its position on the plan?

Ask for the sanctioned building plan, DO3-KIADB-00128/26-27/BP, approved by KIADB on 13 August 2026.

5. What power backup do the apartments get?

A generator serves all common areas. Every apartment pays a fixed generator charge of ₹85 per sq ft plus GST at possession.

6. What is the water source for the project?

The RERA filing records borewells as the source of water for the residential phase.