Namma Metro Blue Line (Airport City): Construction Update

Namma Metro Blue Line Construction Update | North Bangalore


The Namma Metro Blue Line (Airport City) construction update covers the Bangalore airport line, which runs 58.19 km with 29 stations. It is being built in two phases. Phase 2A along the Outer Ring Road is targeted for December 2027. Phase 2B to the airport is targeted for March 2028. Doddajala, the station closest to Prestige Parklane, is on the airport section and has a depot beside it. This matters to apartment buyers in North Bangalore, where Prestige Parklane offers 1,788 apartments from ₹56 lakh.

Namma Metro Blue Line Key Facts


Here are the key facts about the Namma Metro Blue Line:

Detail Value
Total length 58.19 km
Total stations 29
Phase 2A, ORR section 19.633 km, 13 stations
Phase 2B, airport section 38.56 km, 16 stations
Phase 2A target December 2027
Phase 2B target March 2028
Construction began August 2021 for Phase 2A, February 2022 for Phase 2B
Depots Baiyappanahalli and Doddajala
Rolling stock 222 coaches ordered from BEML for ₹2,217.78 crore

Source: BMRCL project figures as summarised on this site, as of 21 November 2026. Target dates can change.

Blue Line Phase 2A and Phase 2B


Blue Line Phase 2A runs along the Outer Ring Road in two stretches. Central Silk Board to Kadubeesanahalli covers 9.9 km and 7 stations. Kadubeesanahalli to Krishnarajapura adds 9.85 km and 6 more stations.

Phase 2B goes to the airport, also in two stretches. Krishnarajapura to Hebbal covers 11.35 km and 8 stations. Hebbal to KIAL Terminals runs 27.09 km with 8 more stations.

Blue Line Airport Section Stations in North Bangalore


The Blue Line airport section has eight stations between Hebbal and the airport, listed here in order from south to north:

  • Hebbala
  • Kodigehalli
  • Jakkur Cross
  • Yelahanka
  • Bagalur Cross
  • Doddajala
  • Airport City
  • KIAL Terminals

Doddajala is the station that serves the Devanahalli and KIADB Aerospace Park side of the corridor. KIAL Terminals is the airport station at the end of the line.

Blue Line Interchange Stations


Blue Line interchange stations connect it to most of the network, so it is useful beyond airport trips:

  • Central Silk Board: interchange with the Yellow Line.
  • Agara and Ibbaluru: interchanges with the Red Line.
  • Krishnarajapura: interchange with the Purple Line.
  • Kasturi Nagar: interchange with the railway.
  • Nagawara: interchange with the Pink Line.
  • Kempapura: interchange with the Orange Line.
  • Hebbal: interchange with the Orange and Red Lines.
  • KIAL Terminals: connection to the airport.

Blue Line Construction Status


Blue Line construction on Phase 2A began in August 2021, and on Phase 2B in February 2022. Both are under construction. The ORR section is due first, in December 2027, and the airport section in March 2028.

Reported costs vary by source. One figure puts the line at ₹14,788 crore, and a tendering summary gives ₹11,847.96 crore.

Metro dates can change, and this line has been under construction for several years. Treat the targets as current guidance, not a promise, and check BMRCL updates before relying on a date.

Distance From Prestige Parklane to Blue Line Stations


Until the airport section opens, residents reach the Blue Line's stations by road. These are the road distances from Prestige Parklane, measured with OpenStreetMap routing:

Station area Road distance from Prestige Parklane Free-flow drive time
Doddajala 20.6 km About 21 minutes
Bagalur Cross 27.5 km About 27 minutes
Yelahanka 32.8 km About 33 minutes

Source: road distances and free-flow drive times from OpenStreetMap routing, checked on 21 November 2026. Distances are to the Doddajala, Bagalur Cross and Yelahanka localities, not to the station entrances, which are still being built. Peak-hour traffic adds time, so check a live map before you travel.

Doddajala is the closest station area, at about 20 km. The airport itself is 20 km from the project, 25 to 30 minutes by road. For apartment buyers in North Bangalore, this means the metro will mainly help trips towards Hebbal and the city, while the airport and the STRR remain the main links for daily travel from Prestige Parklane.

Once the airport section opens, the bigger gain is the network beyond it. From Hebbal the Blue Line connects to the Orange and Red Lines, and from Nagawara to the Pink Line, so a resident who drives about 20 km to Doddajala can then reach most of Bangalore by metro without changing to road. That is why buyers of apartments in North Bangalore watch the March 2028 target closely, even though the station is not on the project's doorstep.

Nearest Metro Station to Prestige Parklane


The nearest metro station to Prestige Parklane is Doddajala, on the airport section. One of the line's two depots is also at Doddajala. Prestige Parklane is located at Plot No. 24 in KIADB Aerospace Park Phase 2, 2 km from the STRR at Devanahalli.

The metro should open before possession. Even on the later March 2028 target, the line should be running well before the project's declared possession date of 6 January 2031.

Until then, apartment residents will rely on roads. The STRR is 2 km from the project and already in use, and the airport is 20 km away by road.

FAQs


1. What is the Namma Metro Blue Line?

It is Bengaluru's airport line, 58.19 km long with 29 stations. It runs from Central Silk Board along the Outer Ring Road, then north to the airport.

2. When will the Blue Line open?

Phase 2A along the ORR is targeted for December 2027, and Phase 2B to the airport for March 2028.

3. Which metro station is nearest to Prestige Parklane?

Doddajala station, on the Phase 2B airport section, is the nearest, and one of the line's two depots is planned there as well.

4. How many stations are on the airport section?

Phase 2B has sixteen stations overall, of which eight run from Hebbal to KIAL Terminals across 27.09 km.

5. Where does the Blue Line connect with other lines?

At Central Silk Board, Agara, Ibbaluru, Krishnarajapura, Nagawara, Kempapura and Hebbal, and with the railway at Kasturi Nagar.

6. Will the metro be ready before Prestige Parklane is handed over?

On current targets, yes. The March 2028 date for the airport section is well ahead of the project's declared possession date of 6 January 2031.