Prestige Parklane project cost is the total declared investment in the nine-tower, 1,788-home project. It covers land acquisition and all development costs, certified in Form 1 by a chartered accountant at registration. This page explains what the numbers mean for buyers and how they connect to the escrow protection built into the RERA filing.

The Three Cost Components


The RERA Form 1 CA certificate for Prestige Parklane breaks the total cost into two heads.

Component Amount (Rs crore) Share of Total
Land 83.64 8%
Development 982.92 92%
Total project cost 1,066.56 100%

The land component is the acquisition cost paid to KIADB. The development component covers civil construction, finishing, common area infrastructure, and project-level overheads. The total is Rs 1,066.56 crore, certified and filed at the time of RERA registration.

Project Cost Per Square Foot and Per Home


The total built-up area is 2,49,535 sq m, which is 26.86 lakh sq ft. At Rs 1,066.56 crore, the project cost works out to about Rs 3,971 per sq ft of built-up area. Per home, the average is about Rs 59.7 lakh across all 1,788 units.

These are average figures. The actual cost per unit varies by apartment type and floor level. A 1 BHK at 567 sq ft costs less to build than a 3 BHK Large at 1,801 sq ft. Per sq ft, the difference narrows because structure and common areas are shared across all homes. The figure is useful as a project-level benchmark, not a unit-level price.

Why Land Is Only 8% of the Total


In many Bengaluru projects closer to the city core, land accounts for 30 to 50% of the total project cost. At Prestige Parklane, it is only 8%. The main reason is the source of the land. It was bought from KIADB under a sale deed dated August 2025. KIADB land in Phase 2 of the Devanahalli aerospace park was priced as industrial and institutional land. This is far below the retail market rate for residential plots in an established suburb.

Industrial park land in an early-phase corridor costs less per acre than land in a city neighbourhood. This low land cost reduces the total cost base and reflects the stage of the KIADB Devanahalli corridor's development.

Project Cost vs Selling Price


The project cost of Rs 1,066.56 crore is not the selling price. The developer does not recover only this amount from buyers. The gap between the RERA cost and the total sales revenue covers several items. GST at 5% is charged on each buyer's payment. Marketing and brokerage costs are significant for a launch of this scale. Finance costs include interest on construction loans drawn before buyer collections cover each stage. Developer overheads and margin are also in the gap.

None of these are part of the declared project cost. Project cost is the construction budget. The selling price is what buyers pay for the product, the brand, the location, and the developer's profit. Presenting the gap as "builder profit" is an oversimplification. Most of the gap is absorbed by tax, marketing, and finance before any margin is reached.

Why RERA Requires 70% of Collections in Escrow


RERA's escrow rule is directly linked to project cost. The law assumes a project must collect roughly its declared cost from buyers. It requires 70% of those collections to stay in a separate account and be used only for construction. At Prestige Parklane, this account is at ICICI Bank, RMZ Infinity branch.

If the total collections from 1,788 homes equal roughly the project cost, the escrow holds about 70% of Rs 1,066 crore — close to Rs 750 crore — earmarked for construction only. This prevents funds from being diverted to other projects or uses. The Rs 1,066.56 crore cost figure sets the scale of the construction commitment the escrow is designed to protect.

What This Tells a Buyer


The RERA cost filing is a transparency tool. It confirms the scale of the investment, shows that the land was acquired and not held on lease, and sets a verifiable baseline for the escrow calculation. It does not tell a buyer whether the project is priced fairly. For that, compare the saleable price per sq ft with similar projects on the KIADB Devanahalli corridor. The project cost is a data point, not a pricing benchmark.

Frequently Asked Questions


1. What is the total project cost of Prestige Parklane?

The total project cost is Rs 1,066.56 crore, certified by a chartered accountant in Form 1. This includes Rs 83.64 crore for land and Rs 982.92 crore for development.

2. How much did the land cost?

Land was acquired from KIADB under a sale deed dated August 2025 at Rs 83.64 crore. This is 8% of the total project cost. KIADB land in the aerospace park was priced below retail residential land rates in the city.

3. What does the development cost cover?

The development cost of Rs 982.92 crore covers civil construction, finishing works, common areas, infrastructure, and project-level overheads. It includes the nine towers, three basements, the clubhouse and amenities. The enterprise estate on the 20.35-acre side is a planned future phase and is not part of this cost.

4. Is the project cost the same as the selling price?

No. The project cost is the construction budget. The selling price also includes GST at 5%, marketing and brokerage, finance costs, overheads, and the developer's margin. These are not in the cost figure.

5. What is the project cost per home?

At Rs 1,066.56 crore across 1,788 homes, the average is about Rs 59.7 lakh per unit. On a built-up area basis, it is about Rs 3,971 per sq ft of the 26.86 lakh sq ft total.

6. How is the project cost connected to the escrow account?

RERA requires 70% of buyer collections to be held in an escrow account for construction only. At Prestige Parklane, this is at ICICI Bank, RMZ Infinity branch. The Rs 1,066.56 crore cost figure sets the scale of construction funding the escrow is designed to protect.