Prestige Parklane approvals and NOCs cover a building plan, three outside clearances, and five title documents. All are uploaded to the RERA portal under number PRM/KA/RERA/1251/309/PR/150926/008941. Every document can be downloaded without a login. This page explains what each one confirms and why some approval bodies are not on the list.

The Building Plan


KIADB passed the building plan on 13 August 2026 under reference DO3-KIADB-00128/26-27/BP. The plan shows the floor count, tower layout, setbacks, and total built area. KIADB is both the land body and the planning body for Phase 2 of the aerospace park. Projects in Phase 2 go through KIADB for plan approval, not BBMP.

The start permit, approved floor plans, elevation drawings, and cross-sections are on file alongside the plan. These confirm that work can begin on the filed drawings. For buyers, an approved plan from the same body that owns the land is a clean start — the land, the planning rights, and the building permission all trace back to one authority.

NOCs Filed


Three outside bodies issued clearances before RERA registration.

Water NOC (KWSSB). The Karnataka Water Supply and Sewerage Board cleared the water supply connection for the project. KWSSB checks the connection point and the flow rate before it issues a NOC. A water NOC is a legal rule for a project of 1,788 homes.

Fire NOC (Fire Force). The Karnataka Fire Force confirmed that the safety design meets the building code for a G + 24 floor tower. The review covers stair pressurisation, sprinklers, the refuge floors on level 19, and the fire exits in each tower.

Airport NOC (AAI). The site is about 20 km from Kempegowda International Airport, 25 to 30 minutes by road. Buildings within the airport's height funnel need an AAI permit. The towers are 76.55 m tall. That height placed them inside the funnel zone, so AAI clearance was a legal step before work could start.

Supporting Documents


Other files on the portal include a BESCOM receipt, a MoEF green-fee receipt, an STP drawing, and a stability report.

The BESCOM receipt shows the power connection fee was paid. The MoEF receipt covers the green fee that the law requires from large housing projects. The STP drawing shows that waste water is treated on-site rather than discharged to the drain. The stability report from a structural engineer confirms the foundation and frame design are safe.

Why Some Bodies Are Not on the List


Seven bodies are marked not applicable in the RERA filing. Each has a specific reason.

BSNL. BSNL clearance is needed only if work cuts an existing underground cable route. This KIADB site has no such route.

Lift body. The Electrical Inspectorate issues a lift permit at handover — after the building is done, not at the RERA filing stage. This is a post-construction step, not a pre-registration one.

BMRCL. BMRCL clearance applies only to buildings next to or above a metro line. No metro route runs through KIADB Phase 2 at Devanahalli.

Railways. A rail NOC is needed within a set distance of a track. The nearest line is the Yelahanka–Penukonda track, several km away. This site is outside that zone.

BRUAA. The Bangalore Urban Arts Commission covers heritage and sensitive zones in central Bengaluru. KIADB Phase 2 is an industrial estate outside its area.

Neighbour NOC. A neighbour NOC is needed when a wall abuts a private plot. KIADB land here is surrounded by other KIADB land. There is no private plot next door.

CRZ. CRZ rules apply within 500 m of the coast. Devanahalli is about 350 km inland. No CRZ zone applies here.

Title Documents


The title papers confirm the developer's right to the land. The promoter is Apex Realty Management Private Limited, a Prestige Group company (CIN U45200KA2018PTC119740, GSTIN 29AARCA7125N1ZY).

Document Detail
Sale deed from KIADB Dated 25 August 2025
E-Khatha Dated 16 July 2025
Encumbrance check No prior claim on the land
Title report and search Confirms clear ownership
No-litigation affidavit No court dispute on the land

The sale deed shows the land was bought, not leased, from KIADB. KIADB-sourced land means the title chain is short and clean — KIADB acquired the land and sold it to the developer under a formal deed. The no-litigation affidavit is the developer's sworn pledge that the land is free of court disputes.

What These Documents Mean for a Buyer


The plan approval, the NOCs, and the title papers together show that work was cleared before it began. A buyer can verify each document on the portal using the RERA number. This is not just a due-diligence step — it is the buyer's right under the RERA Act, and the law requires all documents to stay on the portal until five years after the occupancy permit is issued.

How to Download the Documents


Go to the K-RERA portal and enter RERA number PRM/KA/RERA/1251/309/PR/150926/008941. Under the documents tab, all NOCs, approvals, and title deeds can be downloaded. No login is needed. The RERA page on the official Prestige Parklane site has a step-by-step guide for first-time users.

FAQs


1. What building plan approval does Prestige Parklane have?

KIADB passed the building plan on 13 August 2026 under reference DO3-KIADB-00128/26-27/BP. The start permit and all approved drawings are on the K-RERA portal with the RERA filing.

2. Does the project have an airport NOC?

Yes. The towers are 76.55 m tall and fall inside the airport height funnel. The AAI clearance is part of the RERA filing and can be downloaded from the portal.

3. Why is there no BMRCL clearance?

No metro line runs through KIADB Phase 2 at Devanahalli. BMRCL clearance applies only to buildings next to or above a metro route.

4. Is the land title clear?

The filing has a KIADB sale deed, E-Khatha, encumbrance check, title report, and a no-litigation affidavit. All are on the K-RERA portal.

5. What does the fire NOC cover?

The Fire Force NOC confirms the safety design meets the building code for a G + 24 tower. This covers stair safety, sprinklers, the refuge floors, and fire exits.

6. Can a buyer download the approval documents?

Yes. All documents in the RERA filing are on the K-RERA portal under number PRM/KA/RERA/1251/309/PR/150926/008941. No login is needed.